Enter a URL to visit via proxy:

Powered by Buildingsurvey
Google
Showing posts with label Info. Show all posts
Showing posts with label Info. Show all posts

Aidilfitri disambut 1 Oktober

29/09/2008 8:20pm

KUALA LUMPUR 29 Sept.— Tarikh Hari Raya Aidilfitri ditetapkan pada Rabu, 1 Oktober, demikian diumumkan oleh Penyimpan Mohor Besar Raja-Raja Malaysia.

“Bagi menyempurnakan titah perintah Seri Paduka Baginda Yang di-Pertuan Agong, setelah diperkenan oleh Duli-Duli Yang Maha Mulia Raja-Raja, Penyimpan Mohor Besar Raja-Raja Malaysia mengisytiharkan bahawa tarikh Hari Raya Puasa bagi negeri-negeri seluruh Malaysia telah ditetapkan pada hari Rabu, 1 Oktober 2008,” katanya.

Beliau berkata demikian menerusi satu kenyataan yang dikeluarkan oleh Pejabat Penyimpan Mohor Besar Raja-Raja Malaysia. - Bernama

Bandar Angkasa



Oleh Hayati Ibrahim
(hmetro online)

MALAYSIA Airport Holdings Berhad (MAHB), akan membangunkan ‘Bandar Angkasa’ atau Aeropolis di kawasan seluas 1,104 hektar berhampiran Lapangan Terbang Antarabangsa Kuala Lumpur (KLIA), yang merangkumi kawasan komersial, mesyuarat, insentif, konvensyen dan pameran (Mice), logistik dan pelancongan serta santai.

Pengurus Besar Pembangunan Tanah MAHB, Muhd Najib Mohd Rawi, berkata projek yang dijangka dilaksanakan dalam tempoh antara 10 dan 15 tahun itu akan mengubah KLIA sebagai pusat bandar yang menawar pelbagai rangkaian produk pelancongan, peruncitan, pembangunan komersial dan operasi kargo serta logistik.

“Sebagai permulaan kita akan memulakan pembinaan kemudahan asas seperti jalan raya dan bekalan air suku kedua tahun depan untuk kawasan komersial dan logistik yang merangkumi kawasan 32 hektar.

“Semua projek berkenaan akan dibangunkan pelabur berminat dan kami akan memajakkan tanah berkenaan untuk satu tempoh yang ditetapkan supaya pembangunan dapat dilaksanakan dengan lancar,” katanya ketika ditemui Bisnes Metro, di Sepang, baru-baru ini.Muhd Najib berkata, pihaknya akan mengiklankan tawaran tender dalam akhbar tempatan untuk menarik pelabur yang berminat membangunkan kawasan itu.

“Permohonan ini tidak terhad kepada pelabur tempatan saja, sebaliknya semua pihak boleh memohon dan kita akan memilih yang terbaik,” katanya.

Beliau berkata, daripada 1,104 hektar kawasan yang akan dibangunkan, MAHB tetap mengekalkan 40 peratus kawasan hijau termasuk menyediakan kemudahan padang golf, sekali gus mengekalkan tema hijau yang memang sinonim dengan KLIA.

Menurutnya, seluas 161 hektar kawasan akan dibangunkan untuk tujuan santai dan pelancongan yang berkonsepkan agro-tourism dengan menyediakan padang golf, taman tema, taman ekstrem dan pusat latihan.

Muhd Najib berkata, dalam jangka masa panjang KLIA Aeropolis akan menjadi penyumbang kepada perolehan segmen bukan penerbangan.

“Perolehan ini boleh dijana daripada pemajakan tanah, bangunan dan pembayaran royalti daripada sesetengah penyewa perniagaan serta pertumbuhan trafik di KLIA,” katanya.

“Pembangunan itu juga dijangka memacu pertumbuhan di kawasan itu, sekali gus menjadikannya sebagai satu destinasi, tempat pertemuan perniagaan dan pusat tarikan kepada orang ramai,” katanya.

Beliau berkata, pelan induk pembangunan sudah diserahkan kepada pihak berkuasa tempatan untuk mendapat persetujuan.

Katanya, MAHB akan melaksanakan aktiviti pemasaran dan promosi untuk menarik pelabur dan pemaju bagi menyertai projek berkenaan.

Hotel Tabung Haji


JEDDAH 21 Sept. - Tabung Haji akan mempunyai hotel sendiri di Tanah Suci Mekah menjelang 2011.

Menteri di Jabatan Perdana Menteri, Datuk Seri Ahmad Zahid Hamidi memberitahu, Tabung Haji kini dalam perundingan peringkat terakhir untuk membina hotel setinggi 30 tingkat dengan 1,650 bilik untuk kira-kira 18,000 jemaah.

"Hotel itu diharap menjadi mercu tanda baru Tabung Haji di Mekah. Selama ini Tabung Haji hanya memajak hotel-hotel untuk tempoh tertentu tetapi dengan pembinaan hotel itu, agensi ini akan memajak untuk jangka panjang di antara 25 hingga 35 tahun," katanya pada sidang akhbar selepas mewakili Timbalan Perdana Menteri, Datuk Seri Najib Tun Abdul Razak melancarkan Persatuan Persahabatan Arab Saudi-Malaysia di sini.

Menurut Ahmad Zahid, pajakan dibuat kerana Arab Saudi tidak membenarkan mana-mana pihak luar membeli dan memiliki hartanah di negara itu.

Kos tanah pembinaan hotel sebelum rundingan bernilai 650 juta rial Arab Saudi dan kos pembinaan dianggar 350 juta rial.

Lokasi hotel Tabung Haji ini terletak berdekatan Masjid Kucing yang jaraknya kira-kira 450 meter dari Masjidil Haram.

"Apabila Masjidil Haram yang sedang dibesarkan itu siap, hotel Tabung haji akan menjadi antara hotel yang terdekat dengan Kaabah," jelas Ahmad Zahid.

Menurut beliau lagi, pembinaan hotel itu dijangka siap dalam tempoh 18 bulan dan boleh digunakan oleh jemaah pada musim haji 2011.

Konsul Haji di Jeddah, Khaled Nordin yang ditemui Utusan Malaysia pula berkata di Mekah, Tabung Haji pada masa ini memajak 11 buah hotel dan di Madinah sebanyak lima buah hotel untuk kegunaan jemaah haji tahun ini.

Di luar lingkaran: Bagaimana inovasi mengubah dunia

Berita Harian Online 21/08/2008

Oleh Johan Jaafar
zulujj@tm.net.my

Inovasi menurut Kamus Dewan bermakna 'sesuatu yang baru diperkenalkan atau dimulakan'. Ia juga bermaksud 'memulakan sesuatu yang baru'. Perkataan ini ada kaitannya dengan ciptaan, kreativiti dan imaginasi. Maka itu dalam konteks yang lebih luas ia bermaksud menghasilkan sesuatu ciptaan yang berbeza daripada kebiasaan, dengan idea baru yang mencorakkan perubahan.

Hari ini inovasi menentukan siapa yang berjaya dan tidak. Produk dan barangan yang inovatif mendahului yang lain. Kelebihan sesuatu idea yang inovatif boleh mengubah sesuatu industri. Idea yang kadangkala kecil dan dipandang ringan tetapi melalui inovasi yang betul menjadikannya hebat dan berkesan.

Bayangkan bagaimana industri pengangkutan yang satu waktu dulu dicorakkan oleh kereta api tetapi berubah dengan inovasi dalam pengangkutan bentuk yang lain. Industri kapal terbang yang selalunya kental dengan cara dan peraturan lama diubah dengan inovasi melalui penerbangan tambang murah. Komputer yang sebelumnya berat dan kompleks dipermudahkan menjadi komputer peribadi (PC) dan komputer bimbit. Telefon bimbit menjadi ciri penting dalam kehidupan moden, tetapi dengan masuknya elemen sistem pesanan ringkas (SMS) dan teknologi kamera dan simpanan muzik, menjadikan peralatan itu boleh memainkan fungsi yang lebih luas.

Inovasi dalam dunia perfileman mengubah cara kita berhibur. Konsep makanan segera merupakan inovasi sistem makanan untuk umum. Starbucks dan Coffee Bean menulis semula hukum hakam generasi baru berkumpul sambil minum-minum atau melayari dunia siber. Google mengubah cara kita mencari maklumat melalui sistem cariannya yang unik. Microsoft sebelum ini melalui inovasi perisian komputer memudahkan pengguna mengendalikan peralatan moden itu.

Internet merupakan sungai besar yang mengalir membawa bersama-samanya ilmu, maklumat selain segala sampah-sarap. Sebelum ini kita berkenalan dan berinteraksi melalui cara tradisional di dalam majalah hiburan atau kelab peminat. Hari ini Friendster, Myspace dan Facebook mengubah cara kita berhubungan di alam siber. Inovasi itu membawa pulangan berbilion ringgit pada penciptanya.

Sistem perbankan selalunya konservatif. Bank dikatakan hanya melayan mereka yang berwang dan mampu menyimpan. Tetapi ahli ekonomi Profesor Muhammad Yamin memulakan sistem pinjaman mikro-kredit untuk rakyat termiskin. Dengan memberikan AS$27 atau kira-kira RM86.4 kepada seorang wanita untuk memulakan pembuatan perabot dari buluh pada tahun 1974, beliau merevolusikan sistem perbankan. Hari ini Bank Grameen di Bangladesh memberikan pinjaman mikro-kredit bernilai RM192 bilion kepada lebih tujuh juta peminjam. Inovasi seperti inilah yang mengubah kehidupan jutaan manusia.

Pemenang Anugerah Merdeka untuk Pendidikan dan Kemasyarakatan, Profesor Diraja Ungku Aziz melihat bagaimana kaedah ribuan jemaah haji menunaikan rukun Islam yang kelima. Beliau mencadangkan konsep sebuah institusi yang dikenal sebagai Tabung Haji. Tabung Haji ialah inovasi luar biasa yang mengubah cara jutaan umat Islam menunaikan tanggungjawab mereka dengan baik melalui sistem terancang dan sistematis.

Pada 1973, beliau membawakan cadangan radikal masa itu untuk mengubah pemberian biasiswa pada satu sistem pinjaman yang mencukupi. Pelajar akan membayar balik pinjaman itu dengan cara yang tidak membebankan. Beliau memberikan empat alasan mengapa perubahan itu perlu: Biasiswa yang tidak akan mencukupi, mereka yang tidak memerlukan mendapat biasiswa, sikap terhadap pemberian percuma dan keperluan kerajaan menjimatkan wang.

Tidak banyak orang yang memberikan perhatian serius pada cadangan beliau masa itu. Sebagai pelajar di Universiti Malaya pada 1975, saya melihat cadangan itu sebagai munasabah dan praktikal. Saya menulis sebuah rencana dalam Mingguan Malaysia pada 15 Jun 1975 dengan judul "Gantikan sistem biasiswa kepada sistem pinjaman." Hari ini kita tahu cadangan Ungku Aziz dijelmakan sebagai Perbadanan Tabung Pendidikan Tinggi Negara (PTPTN) yang semangatnya masih merupakan cadangan Ungku Aziz 35 tahun yang lalu. Inilah inovasi yang dimaksudkan, yang datang daripada pemikiran kreatif.

Hari ini inovasi menjadi kunci dan rahsia kejayaan bukan saja bagi syarikat tetapi negara yang berdaulat. Negara seperti Finland, Ireland, Singapura dan Denmark adalah negara yang kecil dan pernah mundur tetapi berada di tahap teratas dalam keupayaan inovasi. Bukan bahan mentah lagi yang menentukan kelebihan kompetitif sesebuah negara tetapi juga kelebihan penyelidikan dan pembangunannya (R&D) dan inovasinya.

Cabaran bagi negara membangun khususnya ialah untuk memastikan inovasi berada pada tahap dan kedudukannya yang terbaik. Inovasi harus menjadi falsafah yang merubah sistem pentadbiran, hala tuju teknologi dan kemampuan saintisnya. Masa depan dunia ditentukan oleh persaingan untuk menjadi lebih inovatif.

Negara kita tidak terkecuali. Usaha membangunkan modal insan adalah langkah yang betul ke arah melahirkan generasi masa depan yang dilengkapkan dengan skil dan ketrampilan yang sesuai. Pada waktu yang sama kita juga harus melahirkan masyarakat yang kreatif dan inovatif bagi memungkinkan penggunaan sumber sedia ada secara berkesan dan produktif bagi tujuan bersaing. Globalisasi dan dunia tanpa sempadan tidak menunggu mana-mana negara dan komuniti yang lembap dan lemah.

Ketika membentangkan Rancangan Malaysia Kesembilan (RMK-9) di Dewan Rakyat pada 31 Mac 2006, Perdana Menteri, Datuk Seri Abdullah Ahmad Badawi meletakkan Teras Kedua Misi Nasional sebagai 'Meningkatkan keupayaan pengetahuan, kreativiti dan inovasi negara serta memupuk minda kelas pertama'. Dua aspek penting yang dikaitkan dengan teras ini ialah meningkatkan keupayaan dan penguasaan ilmu pengetahuan dan memperkukuh keupayaan sains, R & D, dan inovasi.

Negara tidak mungkin menjadi negara maju tanpa kapasiti sains dan teknologi yang jelas, kata beliau. Salah satu matlamatnya ialah memastikan pencapaian sasaran R&D negara sebanyak 1.5 peratus daripada Keluaran Dalam Negara Kasar (KDNK) menjelang 2010. Satu lagi sasaran utama ialah 'menyepadukan usaha R&D serta memberi perhatian yang lebih terhadap pengkomersialan penemuan R&D'.

John Kao menghasilkan Innovation Nation: How America Is Losing Its Innovative Edge, Why It Matters, and What We Can Do To Get It Back. Buku ini patut menjadi bacaan wajib bagi semua orang yang berminat untuk melihat bagaimana inovasi mengubah dunia. Walaupun tumpuan beliau ialah pada kegagalan Amerika Syarikat (AS) dalam mempertahankan tradisi inovasi dan kreativitinya, tetapi ia relevan untuk negara lain juga, termasuk Malaysia.

John Kao menanyakan apakah rahsia yang membolehkan Finland menjadi negara teratas sebagai ekonomi yang paling kompetitif. Mengapakah pelajar AS kini berada di tangga ke-24 dari segi penguasaan Matematik dan di tangga ke-26 dalam kebolehan menyelesaikan masalah? Mengapakah lebih 30,000 profesional yang cukup terlatih dalam bidang teknologi maklumat berpindah ke Bangalore, India? AS selama ini menjuarai inovasi dalam pelbagai lapangan � daripada filem hingga sistem perbankan. Tetapi kekuatan itu semakin berkurang menjadikan AS ketinggalan dalam banyak hal.

Beliau mencadangkan antara lain Agenda Inovasi Kebangsaan (National Innovation Agenda) bagi AS untuk mengembalikan kekuatan itu. Ia harus bertolak dari 20 hub inovasi yang menjadi penjana bagi menjadikan AS negara yang inovatif semula. Buku ini mengingatkan rakyat AS bahawa the next big idea tidak semestinya datang dari negara maju. Bakat tidak ditentukan oleh mana-mana budaya atau kedudukan geografi. Tidak ada siapa yang mempunyai monopoli idea.

Inovasi juga akan menentukan di mana kita pada masa akan datang.

Kerajaan tarik balik sekatan ke atas blog

11/09/2008 4:11pm

PUTRAJAYA 11 Sept. - Kerajaan tidak lagi mengenakan sekatan terhadap mana-mana laman web atau blog di negara ini.

Menteri Tenaga, Air dan Komunikasi Datuk Shaziman Abu Mansor berkata, keputusan itu dicapai pada mesyuarat kabinet semalam.

“Arahan sekatan yang dikenakan terhadap mana-mana laman web atau blog sebelum ini, termasuk portal berita 'Malaysia Today' ditarik balik berkuat kuasa serta-merta,” katanya pada sidang akhbar di sini hari ini. - Utusan

Keutamaan terowong SMART untuk pengurusan air banjir


KUALA LUMPUR 8 Sept. - Fungsi utama Terowong Pengurusan Air Banjir dan Jalan Raya (SMART) adalah untuk pengurusan air banjir, manakala fungsinya untuk kegunaan bagi laluan trafik adalah keutamaan yang kedua, kata Pengarah Pusat Kawalan SMART (SCC), Ir. Low Koon Sing.

Beliau berkata, berdasarkan keutamaan itu, laluan trafik di terowong berkenaan terpaksa ditutup untuk mengalihkan air banjir apabila keadaan memerlukan.

Katanya, tanpa Terowong SMART, limpahan air sebanyak 1.16 juta meter padu akibat hujan lebat tanpa henti selama tiga jam pada Khamis lepas sudah pasti akan menenggelamkan kawasan-kawasan tertentu di pusat bandar raya.

Kawasan-kawasan berkenaan ialah sekitar Stesen Transit Aliran Ringan (LRT) Masjid Jamek, Jalan Masjid India, Jalan Tun Perak, Leboh Pasar, Kampung Baru, Jalan Tun Razak, Jalan P.Ramlee, Jalan Pinang, Kompleks Lama Mahkamah, Jalan Munshi Abdullah, Jalan Tuanku Abdul Rahman dan Kampung Melayu Ampang.

"Oleh itu, andaian bahawa Terowong SMART tidak berkesan adalah tidak tepat sama sekali," katanya dalam satu kenyataan yang difaks kepada Bernama di sini hari ini.

Kenyataan Low itu dibuat sebagai mengulas kritikan pelbagai pihak mengenai kegunaan serta keberkesanan terowong yang dibina dengan kos RM1.9 bilion itu.

Beliau berkata, sistem terowong itu meliputi tiga Mode, di mana Mode I bermaksud keadaan biasa dan laluan trafik dibenarkan, manakala mode II merujuk kepada keadaan berjaga-jaga namun laluan trafik masih dibenarkan, dan mode III bermaksud keadaan kritikal dan laluan trafik ditutup bagi mengalihkan air banjir.

Katanya, Sistem Pengesan Banjir (FDS) di SCC mengesan hujan cukup lebat pada hari Khamis lepas mulai pukul 2.15 petang yang berlarutan selama tiga jam tanpa henti di beberapa kawasan sekitar Lembah Klang, dengan kelebatan maksimum dicatatkan 105 milimeter.

Beliau berkata, ia mengakibatkan paras air di Sungai Klang dan Sungai Ampang di lencongan masuk Kolam Takungan Berembang meningkat secara mendadak, dan pada pukul 3.43 petang status Terowong SMART berada pada Mode II, seterusnya Mode III, 15 minit kemudian.

Menurutnya, Pusat Kawalan Trafik Motorway (MCC) kemudiannya mengambil langkah menutup laluan trafik, dan mulai menggosongkan bahagian dua tingkat laluan trafik dalam terowong tersebut.

Low berkata, pada pukul 5.01 petang barulah air banjir sebanyak 1.16 juta meter padu dialihkan ke dalam terowong laluan trafik yang telah dikosongkan oleh pihak MCC.

Beliau berkata, laporan akhbar yang merujuk kepada laporan Bilik Gerakan Banjir, Dewan Bandaraya Kuala Lumpur bahawa tiada kejadian banjir berlaku di kawasan pusat bandar raya walaupun berlaku hujan lebat tanpa henti selama tiga jam, menunjukkan fungsi SMART yang jelas.

"Ini jelas menunjukkan bahawa dengan adanya Terowong SMART, ia berfungsi mengalihkan air banjir menerusi tadahan Sungai Klang dan Sungai Ampang, daripada melimpahi pusat bandar raya Kuala Lumpur.

"Sekiranya tiada Terowong SMART, sudah pasti limpahan air sebanyak 1.16 juta meter padu akan menenggelamkan sebahagian daripada kawasan-kawasan di pusat bandar raya," katanya.

- Bernama

Antara Maklum Balas kepada web bs


My dear friend.
It will be good if you can do the web and all other info in English as it takes me 1/4 the time to inderstand and read and I am sure it will reach a bigger audience.
Good luck
Ar.Sr.Akbal S. Sandhu(akbalarc@gmail.com)

------------------------------------------------------------------------

Dear Jo Brave,

Tahniah atas daya usaha anda, saya sangat menghargai penglibatan anda, selalulah berhubung mungkin ada sesuatu yang boleh saya war-warkan juga pada rakan dan sahabat BS seluruh Malaysia.

ColAmin,
Tn Hj Amin(mdamin786@salam.uitm.edu.my)


-

Senggara bangunan kerajaan perlu ditingkat

Utusan Malaysia

KUALA LUMPUR 31 Ogos - Jabatan Audit Negara mendapati tahap penyenggaraan bangunan-bangunan kerajaan di Putrajaya dan Kuala Lumpur secara umumnya harus dipertingkatkan dan ada antaranya perlu dibaiki segera.

Ketua Audit Negara, Tan Sri Ambrin Buang berkata, sehubungan itu, Jabatan Kerja Raya (JKR) telah diminta mengambil tindakan sewajarnya iaitu memastikan semua bangunan tersebut disenggara secara berjadual serta membaiki bangunan yang rosak.

Beliau berkata, ia bagi menjamin semua bangunan kerajaan tersebut berada dalam keadaan baik dan selamat digunakan.

''Jemaah Menteri semasa mesyuaratnya pada 9 Mei 2007 telah meminta Ketua Audit Negara mengetuai pasukan audit menjalankan pemeriksaan secara menyeluruh ke atas semua bangunan kerajaan di Putrajaya dan Kuala Lumpur.

''Ia bertujuan menentukan dan mengenal pasti punca kerosakan sama ada disebabkan oleh kelemahan reka bentuk, pembinaan atau penyenggaraan,'' katanya dalam Laporan Ketua Audit Negara 2007.

Pada 11 April tahun lalu, operasi Ibu Pejabat Imigresen di Putrajaya 'terhenti' apabila berlaku kebocoran paip air di tingkat tujuh, melimpah hingga ke tingkat bawah.

Kejadian yang dipercayai berlaku sejak pukul 2 pagi itu menyebabkan lebih 3,000 orang yang mahu berurusan di situ terpaksa diarahkan ke pejabat cawangan di Kajang, Shah Alam, Wangsa Maju, Kelana Jaya dan Subang.

Dan 17 hari selepas kejadian itu, bumbung dewan di Kementerian Pembangunan Usahawan dan Koperasi, Putrajaya runtuh selain berlaku keruntuhan siling di Kompleks Mahkamah baru di Jalan Duta pada bulan yang sama.

Ambrin dalam laporan itu berkata, pengauditan ke atas bangunan kerajaan itu melibatkan 155 bangunan iaitu 90 bangunan di Putrajaya dan 65 lagi di Kuala Lumpur.

''Pihak Jabatan Audit turut membuat pemeriksaan ke atas 120 ruang pejabat yang disewa di 48 bangunan di Kuala Lumpur,'' katanya.

Beliau berkata, proses pengauditan telah dibuat dengan kerjasama KLIA Consultancy Services Sdn. Bhd.

Industri pembinaan paling terjejas


KUALA LUMPUR 26 Ogos - Menteri Kerja Raya, Datuk Ir. Mohd. Zin Mohamed berkata, industri pembinaan tempatan merupakan sektor yang paling terjejas berikutan penstrukturan semula subsidi minyak yang diumumkan oleh kerajaan pada 4 Jun lalu.

Katanya, syarikat pembinaan di negara ini telah mendapat manfaat daripada sistem subsidi minyak kerajaan sejak sekian lama kerana banyak projek infrastruktur yang dilaksanakan menggunakan barangan dan perkhidmatan domestik.

"Kenaikan harga minyak dunia turut meningkatkan kos pembinaan kerana bahan-bahan binaan seperti simen dan keluli mengalami kenaikan harga yang mendadak sehingga menyebabkan projek pembinaan mungkin tergendala," katanya.

Beliau berkata demikian ketika berucap merasmikan Pameran Binaan Antarabangsa Malaysia (MALBEX) 2008 di sini hari ini.

Teks ucapan beliau dibacakan oleh timbalannya, Datuk Yong Khoon Seng.

Pameran anjuran bersama Reed Exhibitions Sdn. Bhd., (Reed) dan Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB) itu akan berlangsung selama empat hari hingga Khamis ini di Pusat Konvensyen Kuala Lumpur (KLCC).

Turut hadir Presiden Asia Pasifik Reed, Paul Beh; Pengerusi CIDB, Datuk Ir. Jamilus Hussien; Ketua Eksekutif CIDB, Datuk Ir. Hamzah Hasan dan Presiden Persatuan Pemaju Hartanah dan Perumahan Malaysia (REHDA), Datuk Ng Seing Liong.

Mohd. Zin berkata, para kontraktor dan pemaju perumahan boleh memilih untuk menyingkatkan tempoh kerja-kerja pembinaan sebagai salah satu cara bagi mengurangkan risiko projek pembinaan tergendala dengan kadar kos yang tinggi.

"Sekiranya sesuatu projek yang memerlukan tempoh pembinaan selama 18 hingga 24 bulan dapat disingkatkan kepada empat bulan untuk disiapkan, maka ia turut berupaya meningkatkan produktiviti setiap projek yang dilaksanakan pada tahap terbaik," ujarnya.

Menurutnya, tempoh kerja pembinaan boleh disingkatkan dengan menggunakan teknik-teknik pembinaan yang lebih canggih dan menjimatkan kos di samping memecahkan projek pembinaan kepada fasa kecil.

"Sebagai contohnya, penggunaan teknologi sistem binaan berindustri (IBS) perlu digalakkan dalam projek-projek awam dan swasta untuk membantu menangani masalah-masalah yang melanda industri pembinaan di negara ini," katanya.

Sementara itu, Jamilus memberitahu, pihaknya telah menubuhkan satu jawatankuasa pelaksanaan IBS untuk memperluaskan penggunaan teknologi tersebut dalam sektor pembinaan tempatan.

"Kita telah merangka satu pelan induk IBS selama 10 tahun beserta beberapa program bersepadu untuk disertai oleh golongan yang terlibat dalam industri pembinaan bagi menggalakkan penggunaan IBS di negara ini," jelasnya.

Intelligent building

What Is An Intelligent Building?


Over the last 20 years, there has been a lot of discussion and debate about the concept of an “intelligent building.” Work has gone on in many forums to define and quantify what the term really means. The end result of all of these efforts is that an intelligent building is not just one thing. My definition of intelligent buildings is as follows:

“Use of technology and process to create a building that is safer and more productive for its occupants and more operationally efficient for its owners.”

The results from implementing these technologies and processes are buildings that cost less to operate and are worth more to their occupants. For projects that are owner occupied, such as corporate, government, and institutions, the benefits of an intelligent building provide an immediate ROI in terms of higher employee productivity and reduced operating expenses. For commercial developments, these projects are expected to result in above market rents, improved retention, higher occupancy rates, and lower operating expenses. All around, this is a win-win situation!

So what are the technologies and processes that are required to create such a project? The list is long, starting with design and going through long-term operations, retrofit, and eventual decommissioning. See the sidebar article for a brief summary of the attributes.

Let’s start by looking at the design process for intelligent buildings. The decision to make a project “intelligent” needs to come early in the design process. Making the decision to create a new project or retrofit an existing one to make it intelligent is similar to what goes into creating a LEED®-certified project. There needs to be a commitment from the owner and their design team to invest in a project with superior performance and value. Once this occurs, the design process can continue as usual. But it is important to keep the focus on creating a superior project and avoid the temptation to “value engineer” out the intelligent components.

PROJECT SCOPE AND PURPOSE

One of the first attributes in an intelligent design is to carefully evaluate the current and future use of the project. This starts by clearly identifying the purpose and needs of the targeted building occupants. This process will vary depending on whether it will be an owner occupied or a commercial development. For an owner-occupied building, surveys and focus groups can be held with the building occupants, analyzing and prioritizing their needs to select proper project features. For a commercial development, the project target market needs to be identified and attributes designed to suit. For example, an office building might target technology companies that would benefit from an urban environment, high-speed network access, and 24/7 availability.

It is important to realize, however, that few projects are used as originally envisioned. A good intelligent design should incorporate flexibility to allow for easy change. Examples of this type of design characteristic include CLA (communications, life safety, automation), structured cabling design, and open space with movable or demountable partitions. An intelligent building needs to be designed to meet the needs of initial occupants and be flexible to meet the needs of future occupants.

CONCEPT AND BUDGET

When setting initial project budgets, intelligent attributes must be included. Creating an intelligent building does require an investment in advanced technology, processes, and solutions. An upfront investment is required to realize a significant return later on. It is unrealistic to expect to make a project intelligent unless there is early buy in on investment. Again, these decisions need to happen prior to the start of design work. One of the challenges is to educate owners on the benefits of an intelligent building design. Waiting until the MEP is brought on to the design team may be too late. This makes the education of both owners and architects about the benefits of intelligent solutions critical for success.

SITE SELECTION AND INTEGRATION

An intelligent design begins by looking at the site as it integrates with the community. Is this a location that is a new “green field” location, or a reuse of an existing “brown-field” site? Can the project be sited for maximum solar efficiency? How will it fit in with community land and space planning? Does it integrate with existing (or planned) public transportation?

Site integration and impact are critical for environmental impact, and strongly affects how the building occupants interact with the building. At a macro scale, community integration is determined by community space planning and zoning regulations. An intelligent building should go beyond that with consideration as to how this fits in with the community’s needs, transportation, and amenities. The combination of the two makes the building more marketable with a lower impact on the environment.

ENVIRONMENTAL DESIGN

An intelligent building starts with an environmentally friendly design. Creating a project that is environmentally friendly and energy efficient ties in closely with many of the intelligent attributes. Intelligent buildings are designed for long-term sustainability and minimal environmental impact through the selection of recycled and recyclable materials, construction, maintenance and operations procedures. Providing the ability to integrate building controls, optimize operations, and enterprise level management results in a significant enhancement in energy efficiency, lowering both cost and energy usage compared to non-intelligent projects.

Intelligent buildings are intended to be the preferred environment for occupants. This requires focused attention to environmental factors that affect occupants’ perception, comfort, and productivity. An intelligent design finds the balance, providing a superior indoor environment and minimizing energy usage and operating labor. This is where the technology becomes valuable. Using integration and automation we are able to implement solutions that both provide a superior environment and minimize energy (Table 1).

USGBC LEED®

The USGBC LEED program provides an excellent mechanism to promote, measure, and quantify environmental and energy efficiency in both new and existing projects. There is a very strong synergy between an intelligent building design and a LEED-certified design. Intelligent buildings demand reduced energy usage through optimization, system integration, and enterprise applications. LEED certification requires energy efficiency, monitoring, validation, and control of all building systems. The goals and benefits of LEED and intelligent building design go together arm and arm. An intelligent building program should start with LEED certification and work to improve the building beyond that.

BUILDING MODELING

An intelligent design needs to start with a complete model. This modeling begins early on with CAD designs that evolve into project renderings. Using new standards such as AEC-XML and GB-XML, this information can readily be shared with HVAC and other system models. Modeling of an intelligent building will be used not just in design, but will continue into construction and operation.

In the past, building modeling has been widely used as a design tool and often for construction as well. In an intelligent building we would expect that this model will be used by new sophisticated tools that will actually be able to use the original modeling information to make decisions about optimization and continuous recommissioning of critical building systems. Ideally, the model will follow through the lifespan of the building, be updated as necessary and serve as a digital document of the building.

BUILDING CIRCULATION AND NETWORKING

Buildings exist to enable collaboration, allowing occupants to be productive, efficient, and creative. Intelligent buildings provide for improved occupant circulation, interaction, and collaboration. From a design perspective this means attention to how the occupants will circulate through the building. How will they enter the space? How will they move efficiently vertically and horizontally through the space? Can we incorporate digital signage to improve navigation and circulation?

Collaboration can also be improved through the use of design elements to encourage networking in both formal and informal spaces. Formal collaboration
spaces are conference rooms, break rooms, classrooms, and seminar rooms. Informal collaboration spaces include niches and seating spaces in corridors, coffee shops, outdoor seating areas, and other places where building occupants can get together for brief planned or unplanned interactions.

CONCLUSION

The goal of having an intelligent building only starts with early planning in the design stage. In many ways, this mirrors the design and fulfillment of many green or LEED projects today, but it uses technology to provide for a superior space. There are enormous benefits to be gained by creating intelligent buildings. We need to continue to work as an industry to quantify these benefits, educate owners and consultants, and to deliver a superior product to the market.


FEATURE

BENEFIT

Dimmable fluorescent lighting integrated with sun blind control

Optimal lighting level and quality can be determined by the occupants.

Lighting control with motion sensors integrated with security

Only provide lighting as needed. Reduces energy use and increases security.

Natural and displacement ventilation.

More efficient and effective distribution of ventilation.

Use of economizers for free cooling.

Energy efficiency.

Individual temperature and lighting control.

Improved comfort is shown to improve productivity.
Addresses the number one concern of tenants as found in BOMA surveys.

Radiant heating and cooling.

Improved comfort, reduced energy use.

Optimized control algorithms.

Reduce energy use with little or no impact on comfort.

Combined heat and power plants.

Improved energy efficiency and sustainability.

After hours control of lights and HVAC integrated with security.

Improved security while reducing energy use.

Monitoring of IAQ and contaminants.

Improved comfort, safety, and productivity.

TABLE 1. Examples of how technology helped provide energy efficiency and a superior environment.


SUMMARY
Intelligent buildings mean many things depending on your perspective and role. The following list is one summary of these attributes.
Process
Design:
• Flexibility – designed to change;
• Energy efficient design (LEED®);
• Complete building modeling;
• Focus on building circulation and Feng Shui and common spaces for networking;
• Integration with transportation and surrounding community.
Construction:
• Sustainable construction practices;
• Electronic project documentation;
• Modeling extended into construction.
Operations:
• Integration of all systems;
• Remote operations and optimization;
• Tenant portals;
• After-hours operation;
• Maintenance management and dispatch;
• Energy information and management systems;
• Real-time energy response;
• Continuous comfort monitoring and feedback.
Technology
General:
• Tenant amenities:
• Concierge;
• Shopping;
• Restaurants;
• Lodging;
• Parking;
• Restrooms.
• Optimized vertical transport.
• Personal comfort control:
• Temperature;
• Humidity;
• IAQ;
• Lighting;
• Acoustic.
Networking/Telecom:
• Common network infrastructure;
• Structured – maintainable cabling;
• WiFi;
• VOIP; and
• Digital signage.
Security/Life Safety:
• Digital video monitoring;
• Access control and monitoring;
• Automatic fire suppression;
• Fire detection and alarm;
• Egress support (lighting, signage, smoke control, etc.);
• Contaminant monitoring and containment;
• Proximate security/guard services.
Mechanical:
• Energy efficient equipment;
• Thermal storage;
• Combined heat and power;
• Controls optimization;
• Extensive sensing;
• Energy efficiency;
• IAQ;
• Comfort monitoring;
• Internet enabled controls;
• Enterprise integration;
• Water and gas metering, sub-metering.
Electrical:
• Energy efficient lighting;
• Lighting control;
• Distributed generation;
• Dual power feeds/emergency power;
• Power quality monitoring;
• Sub-metering/billing.


**Source from automatedbuildings article



Rumah RM6.6b 27 tingkat

Oleh Bennie Zie Fauzi




KOS pembinaan rumah jutawan petrokimia India, Mukesh Ambani setinggi 27 tingkat di Altamount Road, Mumbai melampaui belanjawan membina hotel ternama dan dikenal pasti rumah termahal di dunia. 'Istana' yang dinamakan Antilla itu dijangka siap awal tahun depan.

Rumah termahal dunia

Mukesh Ambani bakal menggaji 600 pekerja bagi membersih dan menyelenggara kediaman mewah 27 tingkat

NITA Ambani bukan sembarangan wanita, dia adalah isteri jutawan petrokimia tersohor Mumbai sekali gus peneraju Reliance Industries, Mukesh Ambani. Sehingga Mac tahun ini, Mukesh dengan anggaran aset RM142 bilion (AS$43 bilion) dinobatkan laman web Forbes lelaki kelima terkaya di dunia.

Sebagaimana wanita lain di dunia, Nita cukup bertuah kerana suaminya sanggup membina kediaman mewah dan selesa 27 tingkat bernilai RM6.6 bilion (AS$2 bilion) buat diri dan tiga anaknya.

Tanggungjawab membina rumah impian Nita dan suaminya itu diamanahkan sepenuhnya kepada firma arkitek Perkins + Wills and Hirsch Bedner yang sebelum ini diakui kebolehan mereka melalui pembangunan Mandarin Oriental Dallas dan Los Angeles.



Pengarah Pemasaran Hirsch Bedner Associates, Thomas Johnson, berkata arkitek dan juru hias dalamannya bertungkus lumus menyiapkan pelan lantai, memikirkan reka bentuk seterusnya menentukan konsep serta tema bangunan.

Pembinaan kediaman mewah di Altamount Road, Mumbai di atas tapak tanah seluas 4939.81 meter persegi bermula penghujung 2006 dan dijangka siap untuk diduduki pada September 2008.

Bangunan pencakar langit seperti istana itu digelar Antilla bersempena nama sebuah pulau sarat mitos. Kos pembinaannya melampaui belanjawan membina hotel ternama dengan setiap tingkat ditampilkan ukuran, bahan dan struktur seni bina berbeza meliputi lantai, lampu, pintu, bingkai tingkap dan sebagainya.

"Sekiranya aras sembilan menitipkan kemasan logam dan kayu disulami sentuhan kristal, tingkat 11 tidak akan mengetengahkan unsur itu lagi. Ini permintaan Nita yang mahukan pertembungan konsep dengan elemen seni bina bagi ruang konsisten tanpa ada pengulangan gaya," kata pakar hiasan dalaman Hirsch Bedner Associates.


Struktur seni bina berkenaan dibentuk menerusi prinsip Vaastu yang boleh disamakan dengan feng shui. Matlamat utamanya untuk mendapatkan aliran pergerakan sihat ruang berpandukan susun atur strategik bilik, objek dan kemasan.

Kuarters keluarga yang memuatkan sebuah lobi dan menghimpunkan sembilan lif, beberapa bilik penyimpanan serta ruang bersantai terletak di aras tujuh selepas enam tingkat tempat meletak kereta untuk 170 lot parkir. Sebaik menuruni dua sayap tangga dengan selusur bersepuh perak, tetamu bertemu dewan tari menari berhias siling kristal.

Ruang ini menjadi wadah seni menerusi sisipan monitor LCD lengkap sistem pembesar suara selain dibina sebuah pentas pertunjukan.

Sesuai statusnya sebagai usahawan ternama, Mukesh sering menganjurkan majlis korporat di kediamannya. Namun, pandangan isteri dan anak-anak yang menginginkan gaya penataan menggambarkan akar umbi bangsa tidak diabaikan.

Buktinya, sinki yang dibina memanjang dari ruang santai berlanjutan ke ruang hiburan dilengkapi pawagam dan stor wine direka menyerupai daun gingko, spesies tumbuhan yang dekat dengan masyarakat India. Saliran paipnya menampilkan rekaan mirip batang daun yang 'menjalar' hingga ke sinki.

'Health level', aras yang dikhususkan untuk sukan dan riadah menempatkan patio, kolam renang, gimnasium dan studio yoga. Pasangan Ambani memenuhi kawasan patio dengan pelbagai spesies pokok tempatan.

Aras ini juga menyediakan bilik berais khusus kegunaan penghuni dan tetamu melarikan diri dari bahang cuaca kota Mumbai. Menariknya, bilik sejuk ini menawarkan pengalaman berada di negara empat musim apabila disertakan hujan salji buatan manusia.

Pada ketika cuaca nyaman, Ambani sekeluarga berpeluang menghirup udara segar yang ditawarkan empat tingkat landskap terbuka. Kayu yang menguatkan alang dan menyokong dua pertiga bahagian atas bangunan berbentuk ‘W’ mengilhamkan atrium terbuka untuk taman dan halaman.

Landskap hidroponik dan pokok bersifat kekal elemen paling rumit direalisasikan namun kewujudannya didorong dengan sebab. Keupayaan tumbuh-tumbuhan menyerap cahaya matahari dimanfaatkan menjadi sumber tenaga yang boleh diubahsuai merujuk keperluan. Menerusinya, suasana kediaman pada musim panas boleh menjadi dingin manakala ketika cuaca sejuk, suhu menyamankan tubuh.

Empat tingkat teratas dijadikan ruang peribadi Ambani sekeluarga termasuk ibunya, Kokilaben. Istimewanya ruang ini kerana menampilkan pemandangan Laut Arab dan seluruh kota Mumbai.

Menurut Penolong Jurutera BMC, syarikat yang bertanggungjawab mereka pelan cadangan bagi pembinaan bangunan ini, kira-kira 600 pekerja bakal digajikan Mukesh bagi membersih, menjaga dan menyelenggara kediamannya.

Di sebalik nama Antilla

Antilla atau Antillia adalah pulau puaka yang dipercayai berada di tengah Lautan Atlantik di barat Sepanyol. Nama lain pulau mistik ini adalah Isle of Seven Cities, Ilha das Sete Cicades (bahasa Portugis), Septe Cicades, Sanbrandan atau St Brendan dan sebagainya.

Nama asalnya tidak diketahui. Etimologi tertua dikeluarkan pada 1455 menghubung-kaitkan nama itu dengan platonik Atlantis, manakala versi terkemudian mengaitkannya dengan Jezirat Al Tenny, “Pulau Naga”, disebut Pulau Naga oleh ahli geografi Arab.

Legenda pulau bermula pada 74 Tahun Masihi apabila Quintus Sertorius, komander tentera dan konsulat Sepanyol yang baru pulang dari medan pertempuran Mauretania (Utara Maghribi) bertemu kelasi berpengalaman singgah di pulau Atlantik.

Teruja dengan cerita kelasi berkenaan, Sertorius memasang tekad mencari pulau terbabit sebelum mengambil keputusan menetap di situ.

Fakta Menarik Antilla

  • Merujuk pelan, bangunan ini menawarkan ketinggian 173.12 meter bersamaan ketinggian bangunan 60 tingkat. Namun, disebabkan Antilla memperuntukkan 27 tingkat, ini bermakna setiap arasnya dilengkapi siling berketinggian lebih tiga meter daripada ukuran sepatutnya.

  • Enam tingkat tempat meletak kereta bakal memuatkan 170 kereta import tuan rumah. Turut disediakan pusat servis kereta yang ditempatkan di aras tujuh.

  • Tingkat lapan mengandungi pusat hiburan lengkap mini pawagam dengan kapasiti 50 orang pada satu masa.

  • Dua tingkat di atas 'health level' menempatkan unit pangsapuri berdinding kaca untuk penginapan tetamu.

  • Dua tingkat di atas kediaman keluarga diperuntukkan sebagai kawasan penyelenggaraan. Di atasnya pula, disediakan 'ruang udara' berfungsi sebagai bilik kawalan untuk helikopter mendarat.
  • PROUD TO BE 'ANAK BANGSA MALAYSIA'

    PUTRAJAYA 13 Sept — Warga Putrajaya khususnya kakitangan kerajaan yang baru hendak memulakan tugas pagi ini cemas apabila digegarkan kesan daripada gempa bumi berukuran 7.7 pada skala Richter yang berlaku di wilayah Jambi, selatan Sumatera pagi ini.

    Akibat kesan gempa bumi berlaku pada pukul 6.49 pagi waktu Sumatera, 12 jam selepas gempa kuat berukuran 8.2 skala Richter di Bengkulu petang semalam, kakitangan awam yang berada di dalam bangunan di Kompleks E, Kompleks D dan Kompleks C bertindak keluar menyelamatkan diri.

    Ketua Polis Daerah Putrajaya, Supritendan Abdul Razak Abdul Majid berkata, selain kawasan bangunan kerajaan, gegaran itu turut dirasai oleh penduduk yang tinggal di apartmen di sekitar Presint 8 dan 14.

    “Setakat ini keadaan terkawal dan dalam kejadian selama beberapa saat itu, tidak ada sebarang laporan keretakan bangunan atau kemalangan dilaporkan,” katanya kepada Bernama di sini.

    Seorang kakitangan Kementerian Kesihatan di Kompleks E yang enggan namanya disiarkan berkata mereka merasai gegaran tersebut kira-kira pukul 7.55 pagi.

    “Pada masa itu, ada yang sedang baca surat khabar, nak hidupkan komputer dan orang yang baca surat khabar itu perasan dia rasa pening semasa membaca, dia rasa goyang,” katanya.

    Berikutan kejadian itu, mereka mengambil inisiatif sendiri untuk turun walaupun ketika itu tidak ada pengumuman untuk mereka berbuat demikian.

    Selepas kira-kira 10 hingga 15 minit tiada sebarang arahan dikeluarkan, mereka naik semula ke pejabat masing-masing tetapi selang beberapa minit kemudian, pengumuman dibuat oleh polis mengarahkan semua kakitangan di Kompleks E mengosongkan bangunan.

    Kompleks E turut menempatkan Kementerian Pelajaran, Kementerian Pengajian Tinggi dan Kementerian Tenaga, Air dan Komunikasi.

    Kakitangan kerajaan kemudiannya dibenarkan memulakan tugas kira-kira pukul 10.10 pagi selepas pemeriksaan dilakukan oleh Jabatan Bomba dan Penyelamat Putrajaya dan Jabatan Kerja Raya (JKR) bagi memeriksa sebarang keretakan di bangunan berkenaan.-Bernama

    Malaysia ku gemilang

    Betul ke ni adi putra?atau ada "permainan politik"

    JURUKUR BANGUNAN


    SALAM SEJAHTERA KEPADA MEREKA YANG MEMPUNYAI IDEA UNTUK REUNION SILA BERIKAN PANDANGAN ANDA..TERIMA KASIH

    ctos..OHH ctos

    CTOS DISAMAN LAGI, PENIAGA TUNTUT RM100 JUTA

    SUMBER DARI UTUSAN MALAYSIA

    Oleh: NON EINAI MOHD. AMIN

    KUALA LUMPUR 13 Julai – Seorang ahli perniagaan hari ini menyaman syarikat Credit Tip Off Service Sdn. Bhd. (CTOS) dan tiga anak syarikatnya untuk menuntut ganti rugi sebanyak RM100 juta.

    Seeni Mohamed Mohamed Ali, 42, bertindak demikian kerana mendakwa CTOS telah memfitnahnya dengan memberi maklumat yang tidak dikemas kini kepada tiga buah institusi kewangan sehingga beliau gagal mendapatkan pinjaman.

    Seeni yang diwakili peguam Joshua Sambathan memfailkan saman terhadap CTOS Sdn. Bhd., CTOS Data Systems Sdn. Bhd., CTOS-EMR Sdn. Bhd. dan CTOS Business Systems Sdn. Bhd. di Pejabat Pendaftar Mahkamah Tinggi di sini.

    Beliau turut menamakan pengarah CTOS, Chung Tze Keong, 52, dan adiknya Chung Tze Wen, 49, sebagai defendan kelima serta keenam.

    Dalam pernyataan tuntutannya, Seeni Mohamed selaku plaintif mendakwa tiga institusi kewangan iaitu Bank Kerjasama Rakyat Malaysia Berhad, Eon Bank Berhad dan Southern Bank telah menolak permohonan pinjamannya.

    Bank-bank itu, katanya, berbuat demikian kerana khuatir beliau berkemungkinan tidak dapat membayar pinjaman ekoran rekod CTOS tidak dikemas kini.

    Menurut plaintif, institusi-institusi kewangan itu tidak memberikannya pinjaman dengan alasan namanya terpapar semasa carian CTOS yang dikendalikan oleh pihak bank berkenaan.

    Plaintif memaklumkan kepada defendan pertama pada 22 Jun 2005 supaya mengemaskinikan data mengenai dirinya dalam sistem komputer syarikat itu.

    Selepas penolakan permohonan di bank-bank berkenaan plaintif melalui peguamnya telah memberikan laporan terkini kepada CTOS mengenai perkembangan satu tuntutan yang telah dibuatnya di Mahkamah Tinggi Shah Alam pada 22 Ogos 2005.

    Plaintif pada Ogos 2006 cuba membuat permohonan pinjaman untuk perniagaan daripada Syarikat Hitech Pro Sales & Services tetapi syarikat itu turut menolak permohonannya dengan alasan yang sama berdasarkan carian dari sumber defendan pertama pada 10 Ogos tahun yang sama.

    PAC Iktiraf Kebolehan Juruukur Bangunan

    PAC Iktiraf Kebolehan Juruukur Bangunan

    Sr. Ahmad Fauzi Bin Md Sood


    Assalamualaikum...syukur kita pada Allah kerana dengan izinNYA pembentangan kertas kerja yang bertajuk ' Peranan Juruukur Bangunan Untuk Membudayakan Penyelenggaraan Di Dalam Industri Binaan Dan Pengurusan Bangunan' oleh wakil Juruukur Bangunan dari Universiti Malaya pada 21/06/07 di Bilik Jawatankuasa 1, Bangunan Parlimen (Jam 11.30 pagi) telah berjaya mencapai objektif apabila Pengerusi Jawatankuasa Kira-Kira Wang Negara (PAC) YBhg Dato' Shahrir Samad bercadang untuk menempatkan seorang Juruukur Bangunan bagi menjalankan kerja-kerja penyelenggaraan keatas bangunan parlimen dalam masa terdekat ini.

    Kenyataan YBhg Dato' Shahrir Samad ini boleh dirujuk pada kenyataan beliau dalam akhbar Berita Minggu & Mingguan Malaysia bertarikh 24/06/07.

    Salam Perjuangan untuk Profesion Juruukur Bangunan...Sr.Ahmad Fauzi Bin Md Sood

    Akhbar Mingguan Malaysia

    JOHOR BAHARU 23 Jun – Langkah kerajaan melaksanakan pembinaan bangunan berdasarkan konsep reka dan bina atau secara rundingan terus dikenal pasti sebagai punca mengapa bangunan kerajaan menghadapi masalah penyelenggaraan, daripada kebocoran paip kepada keretakan struktur.

    Pengerusi Jawatankuasa Kira-Kira Awam (PAC) Datuk Shahrir Abdul Samad berkata konsep reka dan bina atau rundingan terus yang dilaksanakan ketika ini mewujudkan konflik kepentingan di antara juru perunding dan kontraktor pembinaan bangunan.

    “Jika pembinaan bangunan itu dilaksanakan secara tender terbuka, check and balance di antara juru perunding dan kontraktor pembinaan adalah lebih ketat berbanding konsep reka dan bina atau rundingan terus,” katanya ketika ditemui pemberita selepas menyerahkan surat tawaran kelulusan permit teksi kepada 185 pemandu teksi anjuran Lembaga Perlesenan Kenderaan Perdagangan (LPKP) di sini hari ini.

    Konflik kepentingan antara juru perunding dan kontraktor wujud di dalam konsep reka dan bina atau rundingan terus dalam pembinaan bangunan kerajaan disebabkan juru perunding menerima bayaran dari kontraktor yang membina bangunan itu, katanya.

    Shahrir, yang juga anggota Parlimen Johor Baharu, berkata demikian sebagai mengulas tentang kejadian kebocoran paip dan keretakan struktur pada bangunan-bangunan baru kerajaan seperti hospital dan mahkamah.

    Kejadian terbaru melibatkan kebocoran paip di Hospital Pekan bernilai RM90 juta yang baru sahaja diserahkan kepada Kementerian Kesihatan pada 27 Mac lepas oleh Jabatan Kerja Raya.

    Shahrir berkata mereka yang sepatutnya melaksanakan kerja-kerja penyelenggaraan bangunan adalah juru ukur bangunan bukannya arkitek atau jurutera sivil.

    Langkah Kementerian Kerja Raya melantik juru ukur bangunan sebagai orang yang bertanggungjawab memantau aspek penyelenggaraan bangunan-bangunan kerajaan adalah tepat, katanya.

    Ketika ini, terdapat lebih 2,000 juru ukur bangunan di Malaysia, termasuk yang berkelulusan dalam dan luar negeri dan kepakaran mereka perlu digunakan untuk memastikan bangunan-bangunan di negara ini sentiasa diselenggara dengan baik.

    – Bernama

    Akhbar Berita Minggu

    PAC syor perunding projek dilantik kerajaan


    JOHOR BAHRU: Jawatankuasa Kira-Kira Wang Negara (PAC) berpendapat kaedah reka dan bina serta pemberian tender secara terus kepada kontraktor menyebabkan berlakunya pelbagai masalah yang dihadapi bangunan kerajaan pada masa ini.

    Pengerusinya, Datuk Shahrir Samad, berkata ia disebabkan jururunding yang diambil untuk pembinaan bangunan berkenaan bukan mewakili kerajaan, sebaliknya bekerja dengan kontraktor menyebabkan berlakunya konflik kepentingan.

    Sehubungan itu, katanya, lebih baik juru perunding yang dilantik mewakili kepentingan kerajaan bukan bekerja dengan kontraktor kerana ia tidak dapat memberikan perkhidmatan dengan telus bagi memastikan setiap spesifikasi bangunan berkenaan dipatuhi.

    "Saya rasa Kabinet mengetahui mengenai masalah ini, dan PAC berpendapat hanya dengan pemberian tender secara terbuka dan juru perunding projek dilantik sendiri kerajaan, baru masalah bangunan kerajaan rosak sebaik selepas pembinaan dapat diatasi," katanya di sini, semalam.

    Beliau berkata demikian ketika diminta mengulas mengenai isu bangunan kerajaan yang rosak sebaik saja siap untuk beroperasi.

    Antara bangunan kerajaan yang dilaporkan mengalami masalah berkenaan ialah Kompleks Mahkamah Kuala Lumpur di Jalan Duta dan Hospital Pekan, Pahang.

    Shahrir berkata, walaupun mengikut perjanjian, kontraktor perlu menanggung semua kos kerosakan dalam tempoh setahun selepas beroperasi, tetapi masalah berkenaan tetap memerlukan penyelesaian kerana ia menjejaskan imej kerajaan.

    "Takkan semua bangunan kerajaan yang baru siap dalam tempoh setahun selepas pembinaan perlu dibaiki, sudah tentu ia menjejaskan imej kerajaan," katanya.

    Beliau berkata, masalah tuduh menuduh antara kementerian tidak dapat menyelesaikan masalah terbabit, sebaliknya hanya menimbulkan rasa dangkal di kalangan rakyat kerana menunjukkan seolah-olah dua kementerian bertanggungjawab terhadap bangunan terbabit tidak boleh bekerjasama.

    Sementara itu, Shahrir berkata, kerajaan bersetuju menempatkan dua jurutera di Parlimen bagi memantau aspek penyelenggaraan bagi mengelakkan berlaku masalah hingga menjejaskan imej institusi berkenaan.

    Bagaimanapun, katanya, PAC akan meminta kerajaan supaya satu daripada jawatan berkenaan diberikan kepada juru ukur bangunan kerana golongan berkenaan lebih berkemahiran dalam aspek penyelenggaraan berbanding jurutera.

    "Kita tidak faham mengapa kepakaran juru ukur bangunan tidak digunakan sepenuhnya di negara ini, sedangkan mereka berkemahiran dalam aspek penyelenggaraan dan negara melahirkan lebih 2,000 juru ukur bangunan setiap tahun dari universiti tempatan," katanya.

    JIN MERASUK,KORBAN DENGKI!!!

    Assalamualaikum dan salam sejahtera..

    **AMARAN KEPADA SESIAPA YANG MERASAKAN SEMANGAT DIA KURANG MAKA TIDAK DIGALAKKAN UNTUK MENONTON KERANA VIDEO INI BOLEH MENGGANGGU SEMANGAT ANDA!!**



    Sai Baba - Tanda akhir zaman???

    Assalamualaikum sekadar untuk tatapan rohaniah,editor memberikan satu informasi yang mungkin berguna atau mungkin sebaliknya untuk tatapan visitor blog ini.Artikel ini diambil dari laman web :- http://emjayjb.multiply.com/journal/item/115



    Sai Baba


    Assalamualaikum wbh pembaca Laman Emjay sekelian,

    Berikut adalah satu email kiriman sdr Mohamad Sidek Shara. Terima kasih.

    Saya sekadar memanjangkannya kerana menarik namun saya tidak pasti tentang kesahihan email ini, penulisnya dan tarikh penulisannya.
    ~~~~~~~~~~~~~~~~~~~~~~~~~~~~

    Sai Baba - NAUDZUBILLAH MINDZALIK . .

    Salah satu tanda akhir zaman yang akhir-akhir ini cukup menyedot
    perhatian adalah kehadiran seorang bernama Sai Baba, dia lahir dan
    tinggal di Desa Nilayam Puthaparti, wilayah timur Khurasan, tepatnya
    India Selatan.

    Rasulullah saw bersabda kepada kami, Dajjal akan keluar dari
    bumi ini dibagian timur bernama Khurasan (Jamiu at Tirmidzi).

    Abû Hurayrah meriwayatkan bahwa Nabi saw. bersabda:"Hari Kiamat tidak akan datang hingga 30 Dajal (pendusta) muncul, mereka semua berdusta tentang Allah dan Rasul-Nya. "

    Bisa jadi Sai Baba ini adalah salah satu dari 30 dajal-dajal kecil yang akan membuka jalan bagi munculnya al-Masîh al-Dajjâl (Dajjal nantinya akan berperang dengan imam mahdi dan di bunuh oleh nabi Isa as).
    wallahu al'am..


    Laki-laki ini memiliki kemampuan menghidupkan orang mati, menyembuhkan orang lumpuh dan buta, bahkan mampu menurunkan hujan dan mengeluarkan tepung dari tangannya. Ia juga mampu berjalan melintasi belahan bumi dalam sekejap, menciptakan patung emas, merubah besi menjadi emas, dan banyak lagi berbagai fitnah yang ditunjukkan oleh Sai Baba kepada ribuan orang - bahkan - jutaan yang datang dari berbagai suku bangsa dan agama. Saat ini laki-laki ini sudah memiliki puluhan juta pengikut..

    Maka sudah saatnya bagi setiap muslim untuk mengetahui masalah ini, agar dirinya tidak menjadi korban berikutnya dari fitnah Sai Baba ini.

    "Dajjal adalah seorang laki-laki yang gemuk, berkulit merah dan berambut keriting..." (HR.Bukhari dan Muslim)

    "Diawal kemunculannya, Dajjal berkata, Aku adalah nabi, padahal tidak ada nabi setelahku. Kemudian ia memuji dirinya sambil berkata, Aku adalah Rabb kalian, padahal kalian tidak dapat melihat Rabb kalian sehingga kalian mati (HR.Ibnu Majah)

    Antara DAJJAL dan SAI BABA

    1) Dajjal seorang laki yang berpostur pendek, gempal, berambut kribo, berkaki bengkok (agak pengkor). Sai Baba seorang yang berpostur pendek dan berambut kribo.

    2) Dajjal memiliki mata yang buta. Sai Baba pernah mengalami kebutaan di waktu muda kemudian sembuh kembali.

    3) Dajjal datang dan bersama ada gunung roti dan sungai air. Sai Baba memiliki kemampuan mengeluarkan vibhuti (tepung suci) dari udara melalui tangannya.

    4) Dajjal memiliki kemampuan berpindah dari satu tempat ke tempat lain dengan depat dan kecepatannya seperti hujan badai atau secepat awan yang ditiup angin kencang. Sai Baba memiliki kemampuan berjalan menjelajahi bumi dalam hitungan kejapan mata.

    5) Dajjal mengikuti pengikut yang sangat banyak, bahkan di akhir zaman nanti banyak manusia yang berangan-angan untuk berjumpa dengan Dajjal. Sai Baba memiliki pengikut yang jumlahnya puluhan juta manusia dari berbagai macam suku, bangsa, negara dan agama.

    6) Dajjal akan muncul dengan mengaku sebagai orang bijak/ baik, sehingga banyak sekali orang yang tertarik untuk mengikutinya. Sai Baba mengaku seabgai orang yang bijak yang membawa misi perdamaian, cinta kasih menghapuskan segala persengketaan dengan bijaksana.

    7) Dajjal akan muncul dan sebagai nabi. Sai Baba memposisikan dirinya sebagai nabi kepada pengikut2nya.

    8) Dajjal akang menggunakan nama Al-Masih. Sai Baba mengaku akan menjelma sebagai Isa Al-Masih setelah tahun 2020.

    9) Dajjal akan mengaku sebagai Tuhan. Sai Baba mengklaim bahwa dirinya adalah Tuhan penguasa alam semesta.

    10) Dajjal akan mendakwahkan agama Allah. Dalam banyak majelis darshanya Sai Baba banyak berbicara tentang Islam, Al-Qur'an dan keharusan untuk memahaminya.

    11) Dajjal mampu menghidupkan orang mati dan menyembuhkan orang sakit. Sai Baba memiliki kemampuan menghidupkan orang mati juga menyembuhkan penyakit kanker.

    12) Dajjal dapat menurunkan hujan. Sai Baba memiliki kemampuan menurunkan hujan dan mendatangkan air untuk irigasi (di NTT sedang di bangun proyek Sai Baba untuk pengairan di daerah yang kering).

    13) Dajjal bisa mengeluarkan perbendaharaan (perhiasan dan harta) dari bangunan yang roboh, lalu perbendaharaan itu akan mengikuti ratunya. Sai Baba mampu menciptakan patung emas, kalung emas, injil mini dan berbagai bentuk medalai berlafadz ALLAH dalam sekejap.

    14) Dajjal akan membunuh seseorang dan menghidupkannya kembali. Sai Baba bisa menghidupkan orang yang sudah meninggal dunia.

    15) Dajjal bisa berpindah raga dan tempat dari satu bentuk ke bentuk lainnya. Sai Baba bisa berpindah dari satu jasad ke jasad lainnya yang merupakan bentuk reinkarnasi dirinya.

    16) Dajjal bisa membesarkan tubuhnya. Sai Baba memliki kemampuan berjalan di udara dan membuat kemukjizatan pada sebuh pesawat terbang.

    17) Dajjal biasa keluar masuk pasar dan makanan. Sai Baba juga manusia biasa yang makan dan minum sebagaimana manusia lainnya, ia juga bisa berjalan ke pasar, rumah sakit, proyek irigasi dan tempat lain yang biasa dikunjungi manusia.

    18) Dajjal bisa memerintahkan bumi untuk mengeluarkan tumbuh2an dan air. Sai baba bisa mengeluarkan air dengan hentakan kakinya.

    19) Dajjal tidak memliki anak. Sai Baba mandul, ia tidak beranak dan tidak berkeluarga (tidak menikah).

    20) Dajjal memimpin orang yahudi. Sai Baba memiliki misi menyebarkan teologi zionis.

    21) Dajjal muncul di zaman pertikaian. Sai Baba mengklaim bahwa ia datang dari masa banyak pertikaian dan persengketaan, dan kedatangannya untuk menegakkan kebenaran dan membinasakan kejahatan

    Wahai kaum muslimin, apa lagi yang kita tunggu, marilah segera kita kembali kepada Allah dan rasulnya.

    "Jika salah seorang diantara kalian telah menyelesaikan bacaan
    tasyahhud akhirnya, hendaklah ia meminta perlindungan kepada
    Allah dari empat hal. Hendaknya ia berkata : 'Ya Allah, aku
    memohon perlindungan pada Mu dari siksa Neraka Jahannam, adzab
    kubur, fitnah (cobaan) hidup dan mati serta dari keburukan
    fitnah Dajjal."


    Visitor juga boleh mendapat informasi lanjutan seperti berikut:-
    http://en.wikipedia.org/wiki/Sathya_Sai_Baba
    http://www.sathyasai.org/
    http://0saibhakta.multiply.com/

    PELUANG MENDAPAT E-BOOKS BERHARGA RM100

    Assalamualaikum,

    PENGUMUMAN PENTING KEPADA VISITOR WEB BLOG INI,PIHAK EDITOR DENGAN BANGGANYA AKAN MEMBERIKAN ANDA E-BOOK YANG BERHARGA RM100 SEKIRANYA ANDA MENDAFTAR KE BUILDINGSURVEY YAHOOGROUPS.

    E-BOOK TERSEBUT SANGAT BAGUS UNTUK MEREKA YANG INGIN MENDAPAT WANG DALAM TEMPOH YANG SINGKAT.PERNIAGAAN DALAM EBOOKS TERSEBUT ADALAH DALAM BAHASA MALAYSIA.EBOOKS PERNIAGAAN TERSEBUT MELATIH ANDA MENJADI JUTAWAN FOREX(SAHAM).

    INI BUKAN JANJI KOSONG,ATAU PENIPUAN.ANDA HANYA PERLU MENDAFTAR DI YAHOOGROUPS BUILDINGSURVEY DAN KAMI AKAN BERIKAN LINK MELALUI RAPIDSHARE UNTUK ANDA MENDAPATKAN EBOOKS TERSEBUT.

    SETELAH ANDA MENDAFTAR DI YAHOOGROUPS SILA EMAILKAN KEPADA BUILDINGSURVEY@GMAIL.COM UNTUK MENDAPATKAN EBOOKS TERSEBUT SECARA PERCUMA.IYA SECARA PERCUMA.

    ANTARA SYARATNYA IALAH PASTIKAN ANDA WARGA UKUR BANGUNAN TIDAK KIRA DIPLOMA,IJAZAH,MASTER ATAU PHD KAMI AKAN BERIKAN EBOOKS TERSEBUT.

    EDITOR MERASAKAN IANYA SANGAT BERBALOI KEPADA SEMUA JURUKUR BANGUNAN.IANYA AMAT MUDAH,ANDA DAFTAR DI YAHOOGROUP BUILDINGSURVEY,KAMI PULA BERI EBOOKS FOREX VERSI BAHASA MALAYSIA SECARA PERCUMA KEPADA ANDA.!!

    JADI TUNGGU APA LAGI?MARI DAFTAR DAN KAMI BERIKAN ANDA EBOOKS FOREX SECARA PERCUMA.


    TERIMA KASIH.
    PENGUMPUL KEKUATAN UNITY BS

    ;;