The Study of Thermal Comfort and Lighting Performace in Heritage Building
Mohammad Ashraf bin Abdul Rahman with supervision from Dr. Sharifah Fairuz Syed Fadzil & P.M. Dr. A. Ghafar Ahmad

1.1 INTRODUCTION

Malaysia has just celebrated its 50th Independence on 31st August 2007. Even we are free from colonization about half a century ago, yet the remaining heritage buildings can still be seen till today. Among some of the heritage buildings is Sultan Abdul Samad Building (Kuala Lumpur), Stadthuys (Malacca) and Kapitan Keling Mosque (Penang).

These buildings have historical and heritage value therefore many actions have been taken by private or public sector to ensure these buildings is well preserved for the future generation. Consequently, our government has gazette several Act and legislation to ensure the originality especially in the usage of construction material like the National Heritage Act 2005, Antiquities Act 1976, Johore Enactment No 7 of 1988, Malacca Enactment No 6 of 1988 and other laws and legislation.

In conjunction with modernization, the heritage buildings that exist till today are influence by environmental surrounding climate that caused most of the buildings to be uncomfortable to the occupants. Global warming too, worsen the condition. Therefore nowadays we find that most of these buildings used mechanical ventilation as their alternative ventilation to ensure the occupant’s comfort.

Changes in technology too, contribute to the changes in function of certain elements in the heritage building. For example, modern lighting is frequent used than the existing lighting in order to fulfil the current needs. With the source of lighting in the market, the lighting quality on the building gives a great impact but in reality lighting is for the purpose of giving a better luminous effect.

All these reason has motivate the writer to make a deep research on thermal comfort issue and lighting in the heritage buildings.

1.2 ISSUE AND PROBLEM STATEMENT

Kapitan Keling Mosque is located at Kapitan Keling Road, Penang is one of the oldest mosque built by the East India Company in the late 18 century. This mosque was built by Caudeer Mohudeen who is one of the Hindu Muslim leaders at that time. In 1801 18 acres of land are used to build the mosque. After his death in 1834 the land is no longer valid. Construction of road and houses reduce the space of the mosque to 8 acres in 1903. This magnificent mosque was built in 1916 to replace the old mosque. According to Majlis Agama Islam Pulau Pinang (MAINPP), after the reconstruction in 1916, Kapitan Keling Mosque has been renovated for four times in a year before its been proposed for preservation in 1996.

Now, Kapitan Keling Mosque has been operational after its conservation in 2003. Conservation helps to restore the mosque from environmental threat such as rain, parasite, and vegetation. Religious activity could be carried out as usual. Nevertheless, close precaution has to be taken in issues such as comfort and conducive for them to do their religious activity. Hot and uncomfortable environment in a way will distract daily activities of those pilgrims especially at peak hours during prayer and on Friday, Tarawikh prayer that make the pilgrims to have the attitude of “laziness” of taking part in religious activity at mosque because of the uncomfortable condition.

The usage of mechanical tools such as air conditioning can help to achieve the optimum thermal comfort. However, the use of mechanical device is limited because it gives effects to aesthetic value and the aim of conservation objective. A. Ghafar Ahmad has made a guideline in his short term research grant stated that several aspect has to be taken into consideration in installing the air conditioning in the old building. One of the aspects that he stated was that the installation of air condition does not damage the building neither does it affect the aesthetic value.

Unsuitable lighting has reduced the value and original condition of the mosque. New absorption source of light indirectly has blocked the usage of daylight that should be applied overall in the mosque. Besides saving the energy effectively, usage if daylight can lighten one’s feeling and is suits the Islamic religion as it request each individual to be more meticulous and not misspent

1.3 RESEARCH QUESTION

The research is directed by the following question:-

1. What are the general physical conditions of the building? Are these conditions within the local comfort zone criteria?
2. Are people comfortable in the building?
3. What are the general illumination levels with daylight and electric light?
4. Are people satisfied with the quantity and quality of light in the building?

1.4 OBJECTIVE OF STUDY

1. To study the effect of climate and surrounding environment to the internal of the heritage building
2. To determine the level of thermal comfort and lighting performance in the heritage building
3. To compare the level of thermal comfort and lighting performance in the heritage building with the new building

1.5 HYPOTHESIS

Compare to the new mosque, the old mosque has a better thermal comfort and lighting.

1.6 SCOPE OF RESEARCH

The research scopes include all of the following:-
1. Heritage Building
For the meaning of heritage building, the writer has chosen Kapitan Keling Mosque as a case study and Tanjung Bugah Jamek Mosque as a comparison study
2. Environmental Study
Focus are given to topic element that is thermal comfort and lighting
3. Heritage Building occupants
Include the staff and prayer group that used the mosque

1.7 LIMITATION OF RESEARCH

1. This research is restricted to the research area only (Kapitan Keling Mosque and Tanjung Bugah Jamek Mosque)
2. Weather condition when taking the reading of the environment
3. Limited time and budget should be taken into consideration in completing the research
1.8 RESEARCH METHODOLOGY

Methods applied in the research are based as the reference towards the objective of the research whereby it is aim at researching the thermal comfort and lighting in a heritage building. In addition, this research is in four (4) stages that includes a literature study, gathering of data, data analysis and recommendation.

1.8.1 Research design

Reserach done on this heritage building of the thermal comfort and lighting is mainly on the quantitative and qualitative aspect. Generally this research can be classified into 5 main sections that include all the following:

i . Information gathering
Three approaches have been suggested in order to carry out this descriptive and exploration research. Syed Arabi Idid (1998) express that the three approaches are make a survey, getting their opinion and depth description of the research area. The writer highlighted that this approaches is known as information gathering method. Information is obtained from the research document while the primer information is obtain from four other method that is through observation, interview, questionnaire and fieldwork measurement at research area.

ii . Document research
Document research is divided into three sections that are the first is the theory or the literature review of the research field, concept, principle and practice on the main topic of the research, thermal comfort and lighting. This theory part is important because the information obtained could be understood clearly. Furthermore, document research will forsee and explain in detail everything that concern with preservation of the heritage building. This preservation practiced include of standard, guideline, legislation that related to the topic of research.

iii . Case study
Case study is one approach to investigate further in details. Through case study, full information could be gathered through observation and participation. Case study will further make a close examination from an angle to get a close visualization of the information needed. The study of thermal comfort and lighting in heritage building has chosen Kapitan Keling Mosque as the case study and Tanjung Bungah Floating Mosque as a comparison study.

iv . Analysis of data
Primary and secondary data that are obtained from document research, questionnaire and information on case study will be analysing. Data obtained will be gathered, analysis through descriptive and analysis method.
v . Suggestion and recommendation
This is the last stage and is the main objective of the research. Analysis from the guidelines and case study will lead to a discovery of the research and hence results and answer to the problems. Discovery obtained will help in the research framework, suggestion and guideline to the project.

1.8.2 Method of obtaining data

In order to obtain the enunciation from these two methods involved the process primer and secondary data is much used.

i . Primary Data.
Primer data is the data that is obtain directly from the processing area. Primer data is obtain through several process such as observation, interview, fieldwork measurement and questionnaire

ii . Secondary data
Secondary data is the second data that obtained from the second party, which is the party that involved in the running of the process. Among those involve are the Majlis Agama Islam Negeri Pulau Pinang (MAINPP), Penang City Council (MPPP), Penang Heritage Trust (PHT) and many other agency. Other sources such as project report that has been done by experts in the field and research report that has been carried out by others.

1.8.3 Methodology charts


Figure 1.1: Methodology charts show the flow of the research.
Source: Own research


1.9 CHAPTER SUMMARY

In general this research focuses on seven (7) chapters as show in the statement below:

1.9.1 Chapter 1: Introduction
This chapter will give a brief on overall subtopics of the study. On the beginning of this chapter, the writer will explain about the introduction of the dissertation, objective and scope of the topic. The explanation covers priority objective of the study, which might need to be achieved. It will follow by the methodology and arrangement of chapter.

1.9.2 Chapter 2: Thermal Comfort
Chapter two will touches about the general overview of the thermal comfort which consist the definition, terms, history, background, types, functions and other aspects that related with thermal comfort.

1.9.3 Chapter 3: Lighting
Chapter three will discuss on lighting and its performance. This chapter will determine the meaning of lighting, basic approaches and the important of lighting in a building. The topic also will discuss about the type of lighting and its operations which must be related to its function.

1.9.4 Chapter 4: Heritage Preservation
Chapter four discuss on heritage preservation from the functional view, problems and importance including the regulation that used. This chapter also touches on the importance of research area on the heritage building.

1.9.5 Chapter 5: Case Study
This chapter will cover on the topic proposed which is “The Study of Thermal Comfort and Lighting Performance in Heritage Building”. It consists of the data collected from the case study precisely including the historical background, development sequence and other information related. The case studies of the dissertation are Masjid Kapitan Keling and Tanjung Bungah Floating Mosque. This chapter also copes the problem arise at the case studies.

1.9.6 Chapter 6: Analysis of Data
Chapter six will analyze the data collection from the case study and transfer it into the diagram or graph. In this chapter also consist of the interpretation and analysis of the result obtained from the fieldwork measurement and survey research. It is also to determine the problems exist and to define the most unsatisfactory facing by the users in the case study

1.9.7 Chapter 7: Conclusion & Recommendation
At the end of the study, this chapter will enclose the conclusion and recommendation of the study to summarize the overall topic clearly.

1.10 TIMELINE

Figure 1.2 presents a timeline depicting the work that need to be done start from the first day of research until meet the deadline.

Figure 1.2: Timeline showing progress on research project.
Source: Own research

1.11 CONCLUSION

The aim of chapter one is to explain briefly about the flow of the research. It will later be explained in detail in other chapter. This research hopefully can build a platform to the society in changing their perception of heritage building and turn it as an asset of Malaysia in future. But the most important thing, this research hop
efully is able to be guideline of the environmental and heritage study in Malaysia.

BACKGROUND INFORMATION ON BUILDING SURVEYING

Who is a Building Surveyor?
A Professional Building Surveyor is a qualified person, by examination and experience, and a member of the Institution of Surveyors Malaysia.

What does a Building Surveyor do?
A Building Surveyor offers specialist services on matters relating to building and property development such as project and construction management, maintenance and repair of building, refurbishment and restoration of old properties, building law and regulation, demolition works and property development.

A competent Building Surveyor is expected to manage, organise, supervise, monitor, evaluate, and coordinate every aspect of building and development work and act as a vital link in the project between all affiliated professions such as architects, engineers, planners and builders. Besides that, Building Surveyors also provide liaison and consultation services aith public and local authorities for the client

WHERE DOES A BUILDING SURVEYOR WORK ?
There is a very good demand for qualified Building Surveyor in local authorities, with housing and building developers, colleges, universities, insurance companies, banking and financial institutions, government and semi-government departments, consultancy firms and research organizations

IN WHICH AREA IS A BUILDING SURVEYOR'S SERVICES REQUIRED ?
The services of a Building Surveyor is required in the following :


Building Control Administration

  1. Scrutiny of building plans for all types of buildings (new as well as alterations) and issuance of building approval.
  2. Imposing and enforcing of legislative requirements of building and construction operations, illegal/unauthorised structures, ruinous and dilapidated buildings.
  3. Inspection of building works during construction and upon completion, issuance of Certificate For Occupation.
  4. Upgrading of buildings to new requirements.
  5. Coordinating the restoration, refurbishment and conservation of buildings of historical importance/cultural heritage etc.

Development and Construction Management

  1. Analysis and feasibility study of project.
  2. Appointment and coordination of consultants.
  3. Negotiations and contract administration.
  4. Project management including monitoring and coordinating of development.

Building Works

  1. Advice on alterations, extensions and refurbishment of buildings including planning and building applications to local authorities.
  2. Diagnosis of building defects and advice on remedial works including structural survey.

Maintenance of Buildings

  1. Planning and implementation of day to day and long term maintenance.
  2. Repair and dilapidation advice and negotiations.

Insurance

  1. Assessment of replacement costs for insurance purposes. Preparation and negotiation of insurance claims - for fire and structural damage and organisation of reinstatement works

Email not displaying correctly? View it in your browser.

Contract Management

Your Logo
Focused On Training
www.nzmctc.com
1 Day CPD Course
HS03: CLAIMS AND DISPUTE RESOLUTION’ IN ENGINEERING AND CONSTRUCTION CONTRACTS Who Should Attend?

Date: 10 June 2008

Time: 8.30 am - 5.00 pm

Venue: Kuala Lumpur

Introduction

This is an intensive course comprising two main modules/sessions on the topics of Claims and Dispute Resolutions.

The course is intended to be more of a workshop involving active participation by the attendees especially during the Q&A Sessions

Project Managers
Site personnel e.g. site agents, clerk-of-works, technical assistants, etc
Cost Consultants
Procurement Personnel
Project Specialists e.g. schedulers, construction managers, etc.


Our Distinguished Speaker

Ir Harbans Singh

He is an Engineer, Chartered Arbitrator, Mediator, Conciliator and Advocate & Solocitor. He commenced his career with the Public Works Department prior to joining an international German consultancy practice with whom he worked locally and then in Kobienz as a designer, resident engineer and contract administrator. Ir Harbans is the recipient of a number of awards, including IEM’s Tan Sri Hj Yusoff Prize for an outstanding technical paper (2001), the Cedric Barclay Award and the Chartered Institute of Arbitrator’s Award for the Diploma in International Commercial Arbitration Examination (Oxford 2003). Ir Harbans is also the author of a series of four books entitled “Engineering and Construction Contracts Management”, a contributor to ‘The Malaysian Standard Precedents and Forms” and a regular speaker at courses and seminars

Purpose

The principal aim of the above course is to expose the participants to:

• The substantive issues pertaining to Claims and Dispute Resolutions.
• The prevailing provisions in the more commonly occurring Standard Forms of Conditions of Contract pertaining to the instant subject, their nature, effects and limitations.
• The important procedures vis-à-vis the types, nature, procedures and effects of Claims and Dispute Resolutions.
• The legalities pertaining to the topics under consideration inclusive of the review of the relevant case law.

Principal Contents
1. CLAIMS

• Overview
• Definitions
• Principal Claimants
• Categorization of Claims
• Common Heads of Claims
• Express Contract Provisions
• The Claim Process
• Resolution of Claims
• Review of relevant case law

2. DISPUTE RESOLUTION

• Overview
• Definitions/Terminology
• Main Sources of Disputes
• Reasons for Disputes
• Principal Disputants
• Traditional Dispute Resolution Methods
• Alternative Dispute Resolution Methods
• Typical Provisions
• Miscellaneous Matters
• Review of Case Law

CPD Point
CPD point will be applied with relevant professional bodies in Malaysia |BEM|BQSM|
Course Fee
RM 450.00 per pax
Registration

Click HERE to download registration form.
Closing date is one week prior to the course progamme's date

Info/Enquiries
info@nzmctc.com
zahidah77@gmail.com

017-6450 540 (zahidah)
017-3635628 (ahma

kursus pada mereka yang berminat

Contract Management

Your Logo
Focused On Training
www.nzmctc.com
1 Day CPD Course
HS02: CONTRACTOR’S SUBMISSIONS, DOCUMENTATION AND CLAIMS’ IN ENGINEERING AND CONSTRUCTION CONTRACTS Who Should Attend?

Date: 29 May 2008

Time: 8.30 am - 5.00 pm

Venue: Kuala Lumpur

Introduction

This is an intensive course comprising the main modules on the topics of Contractor’s Submissions, Documentation and Claims.

The course is intended to be more of a workshop involving active participation by the attendees especially during the Q&A Sessions

Project Managers
Site personnel e.g. site agents, clerk-of-works, technical assistants, etc
Cost Consultants
Procurement Personnel
Project Specialists e.g. schedulers, construction managers, etc.


Our Distinguished Speaker

Ir Harbans Singh

He is an Engineer, Chartered Arbitrator, Mediator, Conciliator and Advocate & Solocitor. He commenced his career with the Public Works Department prior to joining an international German consultancy practice with whom he worked locally and then in Kobienz as a designer, resident engineer and contract administrator. Ir Harbans is the recipient of a number of awards, including IEM’s Tan Sri Hj Yusoff Prize for an outstanding technical paper (2001), the Cedric Barclay Award and the Chartered Institute of Arbitrator’s Award for the Diploma in International Commercial Arbitration Examination (Oxford 2003). Ir Harbans is also the author of a series of four books entitled “Engineering and Construction Contracts Management”, a contributor to ‘The Malaysian Standard Precedents and Forms” and a regular speaker at courses and seminars

Purpose

The major substantive facets of the Contractor’s typical submissions, documentation and claims in an Engineering/Construction Contract.

The prevailing provisions in the more commonly occurring Standard Forms of Conditions of Contract pertaining to the instant subject, their nature, effects and limitations. ... more

Principal Contents

Pre-Contract Award Submissions
Alternative offers/design, Clarifications, Cost rationalization, Technical data/submissions & Miscellaneous

Post-Contract Award Submissions
Insurances, Bonds, Work Programme, Drawings, Method Statements, QA/QC Documents, Health and Safety Documents, Design Calculations, Miscellaneous Documents i.e. Progress Reports, Daywork Records, etc.

Submissions Upon Completion of Works
As-Built Drawings, O & M Manuals, Warranties/Guarantees, Miscellaneous i.e. Indemnities, Statutory Declarations, etc.

Claims
Introduction, Principal Types of Claims, Claims Provisions, Common Claims, Typical Claims Procedure & Recent Case Law Review ...

CPD Point
CPD point will be applied with relevant professional bodies in Malaysia |BEM|BQSM|
Course Fee
RM 450.00 per pax
Registration

Click HERE to download registration form.
Closing date is one week prior to the course progamme's date

Info/Enquiries
info@nzmctc.com
zahidah77@gmail.com

017-6450 540 (Pn. Nor) Download flyer
017-3635628(Mr. Fhirdaus)

Seperti yang telah di warwarkan sebelum ini, pihak web blog ini akan sedaya upaya memberi alternatif kepada jurukur bangunan khasnya dalam mencari lebih pengetahuan dalam bidang pembinaan seterusnya dapat melahirkan usahawan dibawah jenama jurukur bangunan


Pusat Khidmat Kontraktor

Kementerian Pembangunan Usahawan Dan Koperasi

sila klik dibawah


SENARAI KURSUS TERKINI ANJURAN PKK



Pusat Khidmat Kontraktor, Kementerian Pembangunan Usahawan dan Koperasi telah mendapat pengiktirafan

MS ISO 9001:2000


Lagu ni ditujukan khas kepada semua building surveyor...


~AKU RINDU KORANG SEMUAAAAA!!!!!~



PERANAN JURUKUR BANGUNAN

Kemaskini: PERANAN JURUUKUR BANGUNAN UNTUK MEMBUDAYAKAN KEPENTINGAN PENYENGGARAAN DI DALAM INDUSTRI PEMBINAAN DAN PENGURUSAN BANGUNAN

Kawalan
Bangunan Pemeriksaan Bangunan Penyenggaraan Bangunan Audit Bangunan Kualiti Bangunan mula
ISU-ISU SEMASA PENYENGGARAAN

(1) Kerosakan yang berulang
(2) Kos pemeriksaan kecacatan bangunan yang tinggi dan di luar jangka
(3) Pelaksanaan penyenggaraan yang tidak efektif
(4) Staf penyenggaraan yang tidak kompeten/terlatih
(5) Ketiadaan rekod bangunan yang lengkap untuk membantu kerja-kerja penyenggaraan

perkara utama

Rekabentuk
B a h a n
K u a l i t i P e m b i n a a n
K a w a l a n B i n a a n
Penyenggaraan P e n i l a i a n L e p a s D u d u k ( P . O . E )
B a i k p u l i h / M e n a i k t a r a f P ’ b a n g u n a n S e m u l a Staf Yang Kompeten

F
A KTO R 2 UTAM A M E M P E N G A R U H I K U A L I T I P E N Y E N G G A R AA N

Faktor Utama
Mempengaruhi Kualiti Penyenggaraan
REKA BENTUK Kesihatan, Keselamatan & keselesaan Pertimbangan Penyenggaraan Kelestarian Bahan (replaceable) Aksesibiliti Penjimatan Tenaga Iklim Tempatan

Faktor Utama Mempengaruhi Kualiti Penyenggaraan BAHAN Berkualiti (nilai wang) Jangka Hayat Bahan Kesesuaian Iklim Tempatan Mudah Didapati

Faktor Utama Mempengaruhi Kualiti Penyenggaraan
KUALITI P’BINAAN Penyeliaan Ikut Spesifikasi Kawalan Pembinaan Bina Ikut Pelan

Faktor Utama Mempengaruhi Kualiti Penyenggaraan
KAWALAN BINAAN Menepati Perundangan Laporan Ukur Kondisi Sebelum Serahan Pengurusan Serah-Milik

Faktor Utama Mempengaruhi Kualiti Penyenggaraan
P’YENGGARAAN Ikut Jangka Hayat, Penggunaan & Iklim Proaktif Penyenggaraan Berancang Alat (Manual & Komputer)

Faktor Utama Mempengaruhi Kualiti Penyenggaraan
PENILAIAN LEPAS DUDUK (P.O.E) Audit Bangunan Audit Keselamatan & Kesihatan Audit Fasiliti Audit Keselesaan

Faktor Utama Mempengaruhi Kualiti Penyenggaraan
BAIKPULIH/ MENAIK TARAF Ganti, Ubahsuai & Tukar Fungsi Analisis Kondisi Dibuat Terlebih Dahulu Kos & Spesifikasi Ikut Analisis Kondisi

Faktor Utama Mempengaruhi Kualiti Penyenggaraan
P’BANGUNAN SEMULA Laporan Dilapidasi Impak Terhadap Persekitaran Dokumentasi Projek
Rekabentuk B a h a n K u a l i t i K a w a l a n B i n a a n Penyenggaraan P e n i l a i a n L e p a s D u d u k ( P . O . E ) B a i k p u l i h / M e n a i k t a r a f P ’ b a n g u n a n S e m u l a Staf Yang Kompeten

Ciri-Ciri Utama Kekompetenan Kerja-Kerja Penyenggaraan

Ciri-Ciri Utama Kekompetenan Kerja-Kerja Penyenggaraan
1 Memahami dan membudayakan 8 faktor utama mempengaruhi kualiti penyenggaraan
2 Memiliki pengetahuan khas penyenggaraan melalui kelayakan akademik dan latihan
3 Berkemampuan memberi maklum balas tepat kepada pihak berkepentingan
4 Berkemampuan merancang dan melaksanakan kaedah-kaedah penyenggaraan yang betul Staf Yang Kompeten Page 14 Kekompetenan Kerja-Kerja Penyenggaraan analisis kekompetenan Staf Yang Kompeten

Kejuruteraan Awam Senibina Pengurusan Hartanah Ukur Bangunan

praktis ukur bangunan
Kejuruteraan Awam Jumlah Jam Kredit = 126
Kursus-Kursus Penyenggaraan = Tiada
Senibina
Jumlah Jam Kredit = 113
Kursus-Kursus Penyenggaraan = 2 (4 kredit)
Pengurusan Hartanah Jumlah Jam Kredit = 113
Kursus-Kursus Penyenggaraan = 3 (8 kredit)
Ukur Bangunan Jumlah Jam Kredit = 113
Kursus-Kursus Penyenggaraan = 11 (31 kredit)
Analisis Kekompetenan 31 8 4 0 0 5 10 15 20 25 30 35 Ukur Bangunan Pengurusan Hartanah Senibina Kejuruteraan Awam

Bidang Pengajian
J a m K r e d i t P e m b e l a j a r a n K u r s u s P e n y e n g g a r a a n kembali Page 20 Praktis Ukur Bangunan Praktis Ukur Bangunan
Sejarah & Latar Belakang Penempatan Perkhidmatan Pengkhususan Antara Profesional Peranan Juruukur Bangunan Pembahagian Kerja Antara Profesional Manfaat Kepada Masyarakat Praktis Luar/Dalam Negara Matlamat & Perkhidmatan membudayakan penyenggaraan

SEJARAH & LATAR BELAKANG KELAHIRAN JURUUKUR BANGUNAN DI MALAYSIA - Perkhidmatan Dalam Sektor Awam:
i. Dewan Bandaraya Kuala Lumpur, 1950an
ii. Majlis Perbandaran George Town, 1960an
iii. Majlis Bandaran Petaling, 1970an - Perkhidmatan Dalam Sektor Swasta: Malaysian Building Society Berhad, 1970an - Sebagai Badan Profesional:
i. Bergabung Dalam Praktis Am (GP) I.S.M, 1961
ii. Mendapat & Diletak Dalam Akta Juruukur, 1967
iii. Digugurkan Dari ISM Pada Tahun 1972
iv. Diwujudkan Kembali Dalam Tahun 1990 (ISM)


PERANAN JURUUKUR BANGUNAN

Apa Yang Diharap Oleh Masyarakat Bangunan Yang Sempurna Melalui Kawalan Bangunan Berkualiti
A. Bertanggungjawab Menjalankan Tugas-Tugas
i. Pentadbiran & Pengurusan Kawalan Bangunan
ii. Penguatkuasaan Kualiti Bangunan
iii. Pemeriksaan Keadaan Bangunan
iv. Pengurusan Kemudahan & Penyenggaraan Bangunan
v. Penginsuranan Bangunan

Peranan LUAR/DALAM NEGARA UKUR BANGUNAN

Peranan/Bidang Kerja Juruukur Bangunan
i) United Kingdom
ii) Malaysia
iii) Eropah
iv) Australia
v) New Zealand
vi) Ireland
vii) Hong Kong
viii) Jepun

Peranan/Bidang Kerja Juruukur Bangunan i) United Kingdom (R.I.C.S) Secara generik:

Menawarkan khidmat pakar & nasihat
dalam semua aspek berkaitan tanah, harta tanah & pembinaan kepada syarikat-syarikat komersial, kerajaan pusat & tempatan serta syarikat-syarikat swasta.
Perkhidmatan meliputi;
nasihat perundangan hartanah, patologi bangunan, pengurusan projek, penilaian insuran & tuntutan, pengurusan penyenggaraan, dilapidasi bangunan & kesihatan dan keselamatan, nasihat proses kelulusan pelan, pemeriksaan bangunan, audit aksesibiliti, audit tenaga, nasihat pakar konservasi, strategi keselamatan kebakaran & audit kualiti bangunan

Peranan/Bidang Kerja Juruukur Bangunan ii) Malaysia (I.S.M) Secara generik: Kawalan & pemeriksaan bangunan bagi mengesyorkan kepada keutuhan/integriti & pematuhan undang-undang bangunan & pengurusan prestasi dan memeriksa fabrik, komponen-komponen, servis dan keadaan bangunan serta memeriksa keperluan keselamatan, menasihati kerja-kerja perubahan, penyenggaraan bangunan, penambahbaikan, pemuliharaan bangunan, keperluan-keperluan penginsuranan, dan pengurusan guna ruang

PERKHIDMATAN JURUUKUR BANGUNAN • Memantau dan menguatkuasa semua kehendak undang-undang serta peraturan yang ditetapkan kerajaan/PBT melalui perkhidmatan:

SEBELUM
BINA SEMASA BINA SELEPAS BINA - Mengawal selia kualiti pembinaan - Menjalankan kerja audit bangunan - Pengeluaran CCC/CF/ PCF - Memeriksa rekabentuk pertimbangan penyenggaraan - Menetapkan peraturan keselamatan & kesihatan tapak bina - Melaksana ukur kondisi bangunan sekitar - Mengawal selia prestasi bangunan - Melaksanakan penyenggaraan - Memantau keselesaan pengguna - Penilaian lepas duduk - Kerja ukur kondisi dan pemeriksaan - Pemuliharaan/ubahsuai - Pengurusan harta bersama - Penginsuranan bangunan

PERKHIDMATAN JURUUKUR BANGUNAN Perkhidmatan Sektor Awam
•Pihak Berkuasa Tempatan
•Kem. Perumahan & Kerajaan Tempatan
•Jabatan Kerja Raya
•Inst. Pengajian Tinggi/Badan Penyelidikan
•Perbadanan Kemajuan Negeri
• Syarikat Insurans
• Inst. Kewangan/Bank
• Pemaju Harta Tanah Dan Perumahan
• Kontraktor/Pembina
• Pemilik Harta Tanah Dan Bangunan

Perkhidmatan Sektor Swasta perkhidmatan kepada orang awam
• Pemeriksaan Bangunan: - Sebelum Serahan Kosong Bangunan/Perumahan - Tujuan Pembelian/Sewa/Jual - Tetapkan Jumlah Perlindungan Insurans - Pecah Bahagi Hak Milik/Pengurusan Harta Bersama - Tuntutan Kerugian/Kerosakan/Baikpulih - Tetapkan Jumlah Skop Kerja Untuk Perbadanan Pengurusan (M.C)
• Ukur Kondisi Bagi Merekod Keadaan Bangunan
• Khidmat Nasihat Prestasi Bangunan Kepada Pemilik
• Memantau Bayaran Kemajuan Projek

Perkhidmatan Terus Kepada Orang Awam/Pengguna

Bidang Pengkhususan Antara Profesional Dalam Industri Pembinaan Di Malaysia JURUUKUR BANGUNAN JURUUKUR BANGUNAN ARKITEK ARKITEK JURUTERA JURUTERA JURUUKUR BAHAN JURUUKUR BAHAN JURUNILAI HARTA JURUNILAI HARTA JURURANCANG BANDAR JURURANCANG BANDAR ARKITEK LANSKAP ARKITEK LANSKAP JURUUKUR TANAH JURUUKUR TANAH ARKITEK REKABENTUK DALAMAN ARKITEK REKABENTUK DALAMAN a.a.

Kawalan Bangunan Kawalan Bangunan (termasuk penyenggaraan) (termasuk penyenggaraan) b.b. Rekabentuk Bangunan Rekabentuk Bangunan c.c. Kejuruteraan/Struktur Kejuruteraan/Struktur d.d. Kos & Pentd. Kontrak Kos & Pentd. Kontrak e.e. Penilaian, Ejen H/Tanah Penilaian, Ejen H/Tanah f.f. Perancangan Bandar Perancangan Bandar g.g. Lanskap Lanskap h.h. Ukur Tanah Ukur Tanah i.i. Hiasan Dalaman Hiasan Dalaman

Profesion Bertanggungjawab Profesion Bertanggungjawab Bidang Pengkhususan Bidang Pengkhususan
Pembahagian Kerja Antara Profesional Dalam Pemajuan Projek Kerja ukur kondisi, khidmat Kerja ukur kondisi, khidmat nasihat pembangunan semula nasihat pembangunan semula Pembeli/Pemilik Pembeli/Pemilik

JURUUKUR BANGUNAN JURUUKUR BANGUNAN
9 Cadangan pembangunan semula Cadangan pembangunan semula tapak tapak Melaksana patologi bangunan,
Melaksana patologi bangunan, audit bangunan, pengekalan dll audit bangunan, pengekalan dll Pembeli/Pemilik Pembeli/Pemilik

JURUUKUR BANGUNAN
JURUUKUR BANGUNAN 8 Pengekalan, pembaikpulih dan Pengekalan, pembaikpulih dan menaiktaraf bangunan menaiktaraf bangunan Melaksana pengurusan harta Melaksana pengurusan harta bersama, penyenggaraan, bersama, penyenggaraan, fasiliti, POE, penginsuranan fasiliti, POE, penginsuranan Pembeli/Juruhias Dalam/ Pembeli/Juruhias Dalam/ Penilai & Ejen Hartanah Penilai & Ejen Hartanah

JURUUKUR BANGUNAN
JURUUKUR BANGUNAN 7 Penyenggaraan dan perkhidmatan Penyenggaraan dan perkhidmatan bangunan, hiasan dalaman, jualan bangunan, hiasan dalaman, jualan dan pengurusan hartanah dan pengurusan hartanah Menyiasat kualiti, kecacatan Menyiasat kualiti, kecacatan dan pematuhan kontrak jualbeli dan pematuhan kontrak jualbeli Jurubina/Pemaju/Pembeli Jurubina/Pemaju/Pembeli

JURUUKUR BANGUNAN JURUUKUR BANGUNAN 6 Serahan kunci (serahan kosong) Serahan kunci (serahan kosong) kepada pembeli kepada pembeli Menyemak butiran pematuhan Menyemak butiran pematuhan & penyiapan projek bagi tujuan & penyiapan projek bagi tujuan CCC/CF/PCF CCC/CF/PCF Jurubina/Arkitek/Jurutera Jurubina/Arkitek/Jurutera

JURUUKUR BANGUNAN
JURUUKUR BANGUNAN 5 Serahan penyiapan projek kepada Serahan penyiapan projek kepada pemaju pemaju Siasat pematuhan pelan yang Siasat pematuhan pelan yang dilulus, keperluan kesihatan dan dilulus, keperluan kesihatan dan keselamatan di tapak bina keselamatan di tapak bina Jurubina/Arkitek/Jurutera Jurubina/Arkitek/Jurutera Juruukur bahan Juruukur bahan

JURUUKUR BANGUNAN JURUUKUR BANGUNAN 4 Permbinaan dan pengurusan Permbinaan dan pengurusan projek, kualiti, kesihatan dan projek, kualiti, kesihatan dan keselamatan di tapak bina keselamatan di tapak bina TIADA TIADA Arkitek/Jurutera Arkitek/Jurutera Juruukur Bahan Juruukur Bahan

3 Proses Pentadbiran Kontrak, Proses Pentadbiran Kontrak, Spesifikasi dan kos Spesifikasi dan kos Menyemak pelan, integriti Menyemak pelan, integriti bangunan, pengurusan rekod, bangunan, pengurusan rekod, kelulusan pelan pembinaan kelulusan pelan pembinaan Perancang Bandar Perancang Bandar

JURUUKUR BANGUNAN
JURUUKUR BANGUNAN 2 Proses kelulusan pelan bangunan Proses kelulusan pelan bangunan dalam perkhidmatan Pihak dalam perkhidmatan Pihak Berkuasa Tempatan Berkuasa Tempatan Khidmat nasihat & maklumbalas Khidmat nasihat & maklumbalas rekabentuk ke arah rekabentuk ke arah penyenggaraaan penyenggaraaan Perancang Bandar Perancang Bandar Arkitek/Jurutera Arkitek/Jurutera

JURUUKUR BANGUNAN
JURUUKUR BANGUNAN 1 Perancangan dan rekabentuk Perancangan dan rekabentuk projek ataupun pembangunan projek ataupun pembangunan PERANAN KHAS JURUUKUR PERANAN KHAS JURUUKUR BANGUNAN BANGUNAN PENGLIBATAN PENGLIBATAN PROFESION UTAMA PROFESION UTAMA ARAS ARAS KERJA KERJA AKTIVITI AKTIVITI-AKTIVITI UTAMA AKTIVITI UTAMA

BAGAIMANA MASYARAKAT MENDAPAT Manfaat
1) Memastikan bangunan mesra-penyenggaraan dan menghindari dari menerima bangunan yang cacat
2) Mewakili pembeli/pengguna dalam hal-ehwal pemilikan bangunan
3) Mengurangkan masalah keselamatan & kesihatan melalui Penilaian Lepas Duduk
4) Melaksana langkah penyenggaraan berancang
5) Membantu proses mempercepat kelulusan pelan bangunan
6) Membantu permohonan CF/PCF semasa
7) Melaksana kerja pemeriksaan bangunan/ukur kondisi dan penentuan harga
8) Membantu pengurusan harta bersama dan penubuhan Perbadanan Pengurusan (M.C)
9) Membantu memantau kemajuan projek dan bayaran kemajuan
10) Melaksana kerja pengekalan, pemuliharaan, baikpulih dan menaiktaraf

Kaedah-Kaedah Utama Untuk Mewujud & Membudayakan Kepentingan Penyenggaraan Yang Lebih Efektif
(1) Mewujudkan akta
(2) Agensi/organisasi yang memayung profesion berkaitan
(3) Menyediakan latihan untuk melahirkan staf yang kompeten
(4) Menempatkan staf-staf yang kompeten di semua organisasi yang mengurus & memiliki bangunan
(5) Mendedah dan menyediakan akses kepada masyarakat umum untuk mengguna pakai perkhidmatan ukur bangunan

SEKIAN TERIMA KASIH